Lutai 200MW Solar Park
8 -18 2023 941views

Introduction

Project Type
Gobi Solar Park
Owner
CHINT
Location
Aksay Kazak, Gansu Province, China
CO2 Prevented
414,515 tons average annual
Installed Capacity
200 MW
Power Generation
416 million kWh average annual
Module Type
ASTRO 6 Monofacial Module (670W)
Grid-Connected Time
On September 26, 2021, the project was constructed and was connected to the grid on September 30, 2022.
Case Highlights
Tutai 200MW Solar Park installed a total of 384,636 ASTRO 6 modules with core strengths of high power, high efficiency, high quality, low voltage, high string power, and low BOS and LCOE. As the video shows, the project is shaped as a topographic map of China's Gansu Province, building a Green Silk Road in the Gobi Desert. This is the fourth PV project constructed by CHINT at Aksay, making the total installed capacity of local CHINT-constructed plants hit 294MW. On the same day that the Lutai project started to generate electricity, the fifth CHINT-constructed project at Aksay – Yintai 100 MW PV project – was announced to start construction.