Contact Us
Recruitment
News
-
28
2023.7
Astronergy listed as 2023 overall highest achiever by RETC after rigorous PV moduleAstronergy, a pioneer in n-type TOPCon PV modules and globally top 2 TOPCon capacity manufacturer, has been recognized as a ‘2023 Overall Highest Achiever’ in the annual PV Module Index (PVMI) published by the Renewable Energy Test Center (RETC), certifying the great quality, performance and reliability of Astronergy’s PV modules. -
26
2023.7
Astronergy TOPCon modules offering sustainable energy for Singapore F1 raceWith installation of 1,396 pieces of Astronergy n-type TOPCon PV modules, the F1 Pit Building in Singapore to use solar power for the coming Formula 1 Grand Prix F1 race period in September. -
26
2023.7
With new base ready, Astronergy manufacturing capacity go upstairs to 55GWPV module manufacturing equipment is ready at the module workshop of Astronergy Yanchi Manufacturing Base. [Photo/Astronergy] -
18
2023.7
Astronergy gets TÜV Rheinland world’s first PV industry zero-carbon factory certificateAfter two months’ upgradation and verification process, Astronergy Jiangsu Yancheng Manufacturing Base (Yancheng Base) got TÜV Rheinland world’s first PV industry zero-carbon factory certification on July 17, marking one more signpost of Astronergy’s practices for a greener world. -
13
2023.7
500MW Astronergy TOPCon PV modules win bids from POWERCHINAProspect to offer for renewable projects in China’s Jilin Province, Yunnan Province and somewhere with demands, Astronergy’s 500MW ASTRO N5 n-type TOPCon PV modules have won -
10
2023.7
Astronergy TOPCon capacity ups to new high of 38GWSeeing the move-in of manufacturing equipment for 8GW n-type TOPCon PV cells and for 4GW TOPCon PV modules on July 10, the newly-built Zhejiang Yiwu Manufacturing Base
Retrieval
News